India's Solar Push: Targets, Capacity and Policy (2026)

Last updated 18 October 2026 · By Pradeep Kumar, India Solar

In short: India has committed to 500 GW of non-fossil power capacity by 2030 and passed 50% non-fossil installed capacity in June 2025, more than five years ahead of its climate target. Solar reached 150.26 GW by 31 March 2026 after a record 44.61 GW was added in 2025-26, and foreign investment in renewables is allowed up to 100% without approval.

National targets

  • 500 GW of non-fossil capacity by 2030 and net zero by 2070, announced by the Prime Minister at COP26 in November 2021.
  • About 50% of installed power capacity from non-fossil sources by 2030, in India's updated climate commitment approved in August 2022.
  • Reached early: non-fossil sources passed 50% of installed capacity in June 2025 and stood at 51.93% (266,788 MW of 513,730 MW) on 31 December 2025.
  • India's 2035 climate commitment, filed in 2026, raises the aim to 60% non-fossil capacity by 2035 (as reported).

Capacity and growth

MeasureFigureAs of
Installed solar capacity150.26 GW31 Mar 2026
Installed solar capacity162.15 GW30 Jun 2026
Solar added in 2025-2644.61 GW (record; target was 34 GW)FY 2025-26
Non-fossil capacity added in 2025-2655.29 GW (record)FY 2025-26
Solar module manufacturing capacityabout 172 GW31 Mar 2026
India's rank in renewable capacity (IRENA)3rd, after China and the USDec 2025 data

Capacity share and generation share are different: non-fossil sources produced 29.2% of India's electricity in 2025-26, because coal plants run more hours than solar plants. The gap is why demand for new clean power, and for the plants already running, keeps growing.

Programmes behind the growth

  • Production-linked incentive for high-efficiency solar modules: ₹24,000 crore across two tranches (2021 and 2022).
  • Approved List of Models and Manufacturers (ALMM): listed modules, and from 1 June 2026 listed cells, for government-supported projects.
  • PM Surya Ghar rooftop scheme: ₹75,021 crore to solarise 1 crore homes; over 43 lakh done by June 2026.
  • PM-KUSUM for farmers: ₹34,422 crore of central support for about 34,800 MW.
  • Solar parks: 54 parks with 39,188 MW sanctioned by February 2026.
  • Green Energy Corridor transmission: 24,568 MW of renewable power evacuated by February 2026.
  • Renewable tenders of 50 GW a year planned from 2023-24 to 2027-28.
  • Renewable purchase obligation for utilities of 35.95% in 2026-27.
  • GST on renewable energy devices cut from 12% to 5% from 22 September 2025.

What matters most for owners of running plants

  • Getting paid: under the Late Payment Surcharge Rules 2022, utilities' overdue legacy payments to generators fell from ₹1,39,947 crore in June 2022 to ₹3,330 crore in March 2026 (as reported from a Lok Sabha reply).
  • Transmission charges: solar and wind plants commissioned by 30 June 2025 keep a full waiver of inter-state transmission charges; later plants pay a rising share until the waiver ends in July 2028. This favours plants already running.
  • Open access: the Green Energy Open Access Rules 2022 let consumers from 100 kW buy green power directly, widening the market for commercial and industrial sales.
  • Foreign ownership: up to 100% under the automatic route.
  • Budget: the renewable energy ministry's allocation rose to ₹32,914 crore for 2026-27 from ₹26,549 crore (as reported).

Sources

General information only, not investment, legal or tax advice. Rules change and depend on your circumstances; take advice before you act. India Solar does not offer securities or guarantee returns.